Home/Selection/Total cost of ownership

Total cost of ownership for a coding line: a worksheet, not a slogan

Cost 13 min read Published 26 Nov 2026 Sources: field data, published specs
The short answer

Machine price is one of seven lines. On a line running four thousand hours a year, consumables and downtime together are usually four to ten times the purchase price over five years — which is why the cheaper quote and the cheaper machine are frequently not the same quote.

Three ways the maths goes wrong

Almost every bad coding purchase was supported by a spreadsheet. The spreadsheet was not wrong about arithmetic; it was wrong about what it counted.

The one question that fixes all three

"What is the ink consumption in millilitres per hour at this character height and this line speed, and what are the mean hours between unplanned stops?" Two numbers. A supplier who will not put them in writing is selling a machine, not a cost.

The seven lines

Fill this in once per option, on the same assumptions. Use five years: three is too short to see consumables dominate, ten is beyond most equipment lives.

Range bars showing the share of five-year cost held by each of the seven lines, with consumables the widest band
Figure 1. The same seven lines, and how much room each one has. Consumables is the widest band because it is the only line that scales with output.
LineWhat goes in itWhere it hidesTypical share of 5-year total
1 · Machine Purchase or lease, installation, commissioning, training "Training included" often means one day on site, not line commissioning 10–35%
2 · Consumables ml/hour at your height and speed × running hours × unit price Quoted at a lower speed or smaller character than you run 20–55% (inkjet)
3 · Wear parts Printhead, filters, pump, UV lamp, laser source — cost per year, not per lifetime "Lifetime" given in hours you will never reach 5–15%
4 · Downtime Unplanned stops per year × hours per stop × value of a stopped line Never quoted; usually 0% for inkjet, 10–40% for laser 0–40%
5 · Scrap and rework Units or metres lost at start-up and after each stop Matters most on short runs with frequent product changes 2–10%
6 · Operator time Daily cleaning, ink top-up, parameter changes × loaded hourly rate Counted as "no extra cost" because it is existing staff 3–12%
7 · Site and compliance Extraction, solvent storage, compressed air, power, IP rating, training records Discovered after the purchase order 2–10%
LineA · CIJ (annual)B · UV laser (annual)Note
1 · Machine (one-off)12,00038,000Installed and commissioned
2 · Consumables20,00004,000 h × $5.00 (A); electricity sits in line 7
3 · Wear parts1,0002,000Filters, pump (A); source and filters (B)
4 · Downtime1,5007506 h vs 3 h lost per year × $250
5 · Scrap6000Start-up waste after stops
6 · Operator time1,80060045 vs 15 min/day × $20/h
7 · Site2,5004,000Solvent handling (A); extraction (B), one-off
5-year total139,00058,750B wins by 80,250

Illustrative only, and arithmetic you can check: one-off lines are counted once, annual lines five times. A = (12,000 + 2,500) + 24,900 × 5 = 139,000. B = (38,000 + 4,000) + 3,350 × 5 = 58,750.

Stacked bars of five-year cost for CIJ and UV laser, showing consumables dominating one and the machine dominating the other
Figure 2. The same seven lines, filled in. Consumables is 72% of option A and nothing of option B — which is why a five-year total is not a machine comparison.

Two things to notice. First, the machine price is 9% of option A's total and 65% of option B's — the same purchase decision has completely different weight depending on the technology. Second, in option B the machine is the largest line, yet site work and wear parts together are nearly a quarter of the total, and both are usually discovered after the purchase order.

Three cost curves over five years: additive rising, transfer scaling with printed area, laser flat after high entry cost
Figure 3. Before comparing two quotes, know which curve you are on. A five-year total is a point on one of these lines.

What flips the answer

A five-year total is a point estimate on eight assumptions. Before trusting it, move the three that are least certain and see whether the ranking survives. In the example above, the ranking is stable against most movements — but not all.

If this changesEffect on the conclusion
Running hours fall to 1,000 a yearFlips. CIJ's consumables shrink with output; laser's capital does not. At low utilisation the cheap machine wins on total cost.
Ink and solvent reach $9.00 per hourWidens B's lead by roughly 80,000 over five years. Consumable price is the single most powerful input on the CIJ side.
Downtime rises to 20 hours a year (both)Costs A about 18,000 more, B about 21,000 more. Downtime punishes laser harder in absolute terms — its stops are rarer but longer.
Line value is $60 per hour, not $250Downtime stops mattering; the decision goes back to consumables and capital.
Machine life is 8 years, not 5Favours whichever option has the lower annual cost, and the gap grows yearly. Compare over your real replacement cycle.
Do this before you decide

Change the three inputs you are least sure about, one at a time, and see if the ranking holds. If the winner changes, you do not have enough information to decide yet — get the real consumption and downtime figures first.

When the dearer machine wins — and when it does not

The dearer machine wins when three things hold at once: utilisation is high, the mark must survive something (solvent, abrasion, sterilisation), and downtime is expensive. Remove any one and the arithmetic usually reverses.

It does not win when:

Questions we get

Why not just use the supplier's five-year cost calculation?

Because it is built on their assumptions about your line. Ask for the raw inputs — consumption per hour at your height and speed, wear-part intervals in hours, expected stops per year — and put them in your own sheet. If they will not give the inputs, the total is not checkable.

How do I estimate downtime if I have no history?

Use the supplier's stated figure as a floor, not a forecast, then add the time you know you lose to changeovers and cleaning. For a first pass, one shift lost per quarter is a conservative starting point for inkjet and half that for laser — replace it with your own data as soon as you have any.

How does leasing fit into the sheet?

Replace line 1 with the total of payments plus any deposit and end-of-term fees, and check whether consumables are bundled — a bundled rate usually hides a markup that disappears if you buy them separately. Lease terms also often include service, which moves part of line 3 into line 1.

Should used equipment be compared on the same sheet?

Yes, with two additions: a refurbishment allowance for the first year, and a shorter life (three years is realistic for a well-refurbished unit). Used equipment wins on capital and loses on downtime and parts availability — both of which are already in the sheet.

Five years or the life of the machine?

Use your real replacement cycle, not the machine's theoretical life. Most production lines replace coding equipment long before it fails, because the product changed. If your cycle is eight years, run the numbers over eight — the direction rarely changes, but the size of the gap does.